Sarla Aviation plans to launch seven-seater electric flying taxis in Bengaluru, cutting travel time between the airport and Electronics City to 19 minutes. Fares are expected to be Rs 1,700 per trip.
M5 E-City Mall, developed by Mahendra Homes, will open on October 25th Electronics City Phase II, Bengaluru, offering 4,20,000 sq. ft. of retail space, brands, an entertainment centre, and an 8-screen PVR Inox.
Bengaluru will become water-surplus with the launch of the Cauvery Phase 5 project on October 16, supplying water to 50 lakh more residents ( including Bangalore south ). The project includes India’s largest water treatment plant.
Electronics City month to date recorded rainfall 289.5mm, with Average High temperature recorded 28°C to Lowest 19°C. Source: weather.com.
Electronics City Phase-2 Huskur Fruit Market area roads are full of potholes and driving/riding on those roads is very pathetic. Residents urge attention on road development.
The road conditions in Ananth Nagar and Sampige Nagar in Electronics City are in terrible shape, raising serious concerns about the city’s infrastructure.
M5 E-City Mall, developed by Mahendra Homes, will open on October 25th Electronics City Phase II, Bengaluru, offering 4,20,000 sq. ft. of retail space, brands, an entertainment centre, and an 8-screen PVR Inox.
Bengaluru will become water-surplus with the launch of the Cauvery Phase 5 project on October 16, supplying water to 50 lakh more residents ( including Bangalore south ). The project includes India’s largest water treatment plant.
Electronics City month to date recorded rainfall 289.5mm, with Average High temperature recorded 28°C to Lowest 19°C. Source: weather.com.
Electronics City Phase-2 Huskur Fruit Market area roads are full of potholes and driving/riding on those roads is very pathetic. Residents urge attention on road development.
The road conditions in Ananth Nagar and Sampige Nagar in Electronics City are in terrible shape, raising serious concerns about the city’s infrastructure.