The Suryanagar (Indlavadi Village) site in Anekal taluk has received an in-principle go-ahead from the state cabinet for an 80,000-seat international cricket stadium, budgeted at approx ₹2,350 crore across 75 acres of KHB land.
Major traffic chaos on the Attibele–Bommasandra stretch as continuous road-digging slows commuters every dawn and dusk. Urgent intervention needed by National Highways Authority of India and traffic police to restore flow.
Residents of Heelalige Road, Electronic City Phase 2, Bengaluru, demand urgent repairs. Schools and homes flank the stretch, yet the road remains unsafe and full of potholes. Our taxes are paid on time — we deserve proper infrastructure. @MLAShivanna, kindly intervene.
117 km “Bengaluru Business Corridor”, connecting Tumakuru Road to Mysuru Road via Electronic City, announced to complete in two years; land-acquisition with 5 compensation options flagged.
The Yellow Line (Namma Metro) currently runs every 19 minutes with four train-sets aboard. A fifth train is due in early November cutting intervals to ~15 minutes, and a sixth by December should bring headways down to 12 minutes — though lack of a spare trainset remains a challenge.
Under the leadership of CP Seemant Kumar Singh, IPS and DCP M. Narayan, IPS, the Electronic City Police cracked a major gold‐theft case in just 48 hours. The accused, Shreyas, stole 502 g of gold and ₹3.46 lakh in cash — all recovered.
Residents of KIADB Layout, Electronic City Phase 2 report roads (1st Cross & 1st-3rd Main Roads) have remained unrepaired for over five years—open drains, potholes, broken pavements—with no substantial development. They demand immediate action from civic authorities.
India’s first dine-in cinema experience has launched at M5 ECity Mall, Electronic City — where gourmet meals are served straight to your seat during the film.
Major traffic chaos on the Attibele–Bommasandra stretch as continuous road-digging slows commuters every dawn and dusk. Urgent intervention needed by National Highways Authority of India and traffic police to restore flow.
Residents of Heelalige Road, Electronic City Phase 2, Bengaluru, demand urgent repairs. Schools and homes flank the stretch, yet the road remains unsafe and full of potholes. Our taxes are paid on time — we deserve proper infrastructure. @MLAShivanna, kindly intervene.
117 km “Bengaluru Business Corridor”, connecting Tumakuru Road to Mysuru Road via Electronic City, announced to complete in two years; land-acquisition with 5 compensation options flagged.
The Yellow Line (Namma Metro) currently runs every 19 minutes with four train-sets aboard. A fifth train is due in early November cutting intervals to ~15 minutes, and a sixth by December should bring headways down to 12 minutes — though lack of a spare trainset remains a challenge.
Under the leadership of CP Seemant Kumar Singh, IPS and DCP M. Narayan, IPS, the Electronic City Police cracked a major gold‐theft case in just 48 hours. The accused, Shreyas, stole 502 g of gold and ₹3.46 lakh in cash — all recovered.
Residents of KIADB Layout, Electronic City Phase 2 report roads (1st Cross & 1st-3rd Main Roads) have remained unrepaired for over five years—open drains, potholes, broken pavements—with no substantial development. They demand immediate action from civic authorities.
India’s first dine-in cinema experience has launched at M5 ECity Mall, Electronic City — where gourmet meals are served straight to your seat during the film.





